Hall School Construction (23)
Universal Studio - 1956
The corridor under-ceiling is in place but still needs the ceiling tiles. Several lights down the hall are lit, but the opening in the ceiling closest to the camera awaits its light fixture. Most of the walls have their brick facing. An opening in the wall below the window on the left will be filled by heating equipment. A lot of clutter and debris fills the hall including a stack of lumber, electrical cords, two rolling platforms, and waste materials.
Subjects
Full Details
Title | Hall School Construction (23) |
---|---|
Creator | Universal Studio |
Date | 1956 |
Format | Photograph 7 1/2 X 9 1/4 in. |
Notes | Title by cataloger. Noted on back, 7/12/6 upper corridor facing west. Stamped, Universal Studio, 1592 Plainfield NE, Grand Rapids, MI. |
Location In Photo | Grand Rapids, MI |
Rights | Reproduction and copyright information regarding this image is available from Community Archives and Research Center (CARC), Grand Rapids, MI. |
Institution | Community Archives and Research Center (CARC) |
Physical Storage Location | Grand Rapids, MI |